Terminal implementation

VRU design basis

The following parameters are the base for sizing a VRU; Q(i) – Peak flow rate..
Read more

Vapour Truck / Rail Car loading

During the loading of gasoline and diesel in trucks, the concentration of the vapours may vary between 0 to 50%...
Read more

Marine loading

1. Design of the VRU, 2. Vapour connection, 3. Product loading, 4. Absorbent circulation...
Read more

Site works & Pipe connection

Terminal Modification: Modification from top loading to bottom loading if possible: loading time shorter..
Read more

PLC / Electrical connection

unique satellite monitoring and warning system, instrument cables, power cables..
Read more

Safety aspects

VRU is installed in environment containing combustible liquids and explosive gases...
Read more